Friction-based lifting clamp enables safe handling and repair of subsea power cable

IK Subsea developed a friction-based lifting tool for high-voltage subsea cables, enabling safe lifting without damaging the cable during repair operations.

The situation

A high-voltage subsea cable represents critical infrastructure and must be repairable in case of failure. Without a suitable solution, repairs would be complex and time-consuming, risking downtime across installations.

The cable’s multi-layer flexible construction makes it particularly challenging to handle. It must be lifted without damage, requiring high precision and control of friction and clamping force.

The project was developed as a contingency solution, ensuring that a verified lifting and repair tool would be available before a critical failure occurred.


 

The Solution

Concept

IK Subsea developed a friction-based lifting clamp that enables safe handling and lifting of the cable without damaging its multi-layer structure.

Engineering highlights

  • Friction-based lifting principle.
  • Designed for a 184 mm HVAC cable outside diameter.
  • 40-tonne lifting capacity.
  • Tool weight of 2.4 tonnes.
  • Precise control of clamping force.
  • ROV installation using a standard class 4 torque-tool bolt interface.
  • Full-scale testing on the actual cable.
  • Analysis of creep and material behaviour.

Delivery & execution

  • IK Subsea developed and tested the lifting clamp as a contingency solution.
  • The customer was NKT.
  • Aker BP is the operator, with Equinor and Orlen Upstream Norway as licence partners.
  • The solution was developed and tested, but had not been deployed operationally at the time of the case description.

Verification and qualification

  • Full-scale testing on the actual cable.
  • Verified lifting capacity.
  • Controlled material behaviour.
  • Documented safe handling without damage.

Key Facts

IK Group company IK Subsea
Segment Yggdrasil
Location Snøhvit / Norwegian Continental Shelf
Year 2024
Asset type High-voltage subsea cable
Cable dimension 184 mm HVAC cable OD
Lifting capacity 40 tonnes
Tool weight 2.4 tonnes
Depth / Pressure / Temp No depth limitations specified
Delivery model Contingency tool for lifting and repair
Customer NKT
End customer / operator Aker BP, with Equinor and Orlen Upstream Norway as licence partners
Status Developed and tested; not deployed operationally

Challenges

High-voltage subsea cable representing critical infrastructure that must be repairable in case of failure

Flexible cable with a complex multi-layer structure.

Risk of damaging the cable during lifting and repair operations.

Need for precise control of friction and clamping force.

Creep and material deformation in the cable structure.

Need to verify lifting capacity through testing.

Adaptation to a specific cable dimension.

High reliability requirement in contingency scenarios.

ROV installation using a standard class 4 torque-tool bolt interface.

Results

Contingency solution established

The project established a tested contingency solution for handling critical subsea cable infrastructure.

Rapid repair enabled

The lifting clamp enables faster repair preparation in case of cable failure.

Reduced downtime risk

The solution reduces the risk of downtime for installations and field operations.

Development and mobilisation time saved

Having the tool developed and tested in advance can save up to approximately 26 weeks of development and mobilisation time.

Lifting capacity verified

Full-scale testing verified the required lifting capacity.

Cable handled without damage

Testing documented safe handling of the cable without damage.

Related Case Studies

The AOGV provides positive isolation without any physical
modifications or lasting impact to the process plant.

High Pressure PRS for multiple pipe dimensions
RegionAsia
IK-22426 26” Splash Zone Conductor Clamp (North Sea)
RegionNorway
Philippines in-situ Xmas Tree repair
RegionAsia
Repair of a 4” Flexible Flowline in Brazil
RegionBrazil
Shell Qatar severe sour service EPRS
RegionMiddle East
Structural Repair at PLEM Junction - Ultra Deepwater
RegionWest Africa
Xmas Tree Flange Repair - Ultra Deepwater
RegionWest Africa