Orbital Coating Removal Tool

Product/Service:
Orbital Coating Removal Tool
Year:
Jun 2020 / Oct 2020
Location:
Equatorial Guinea
Project Manager:
Bozidar Sevic

Project Description

 

A customer approached IK Subsea looking for a solution for a project in Equatorial Guinea for removal of coating on 6”, 8” and 10” pipe spools, in preparation for hot-tapping operations.

In response to the challenge,I K Subsea designed, tested and manufactured the Mark II Coating Removal Tool, a specialized tool designed for the meticulous removal of multilayer PU (polyurethane) insulation and FBE (Fusion bond epoxy) coatings on 6″, 8″, and 10″ pipe spools. The tool was designed for both horizontal and vertical operations. This innovative tool encompasses milling heads tailored for subsea milling of both steel and PU, as well as wire brushes dedicated to the surface preparation of the bare steel pipe.

 

Noteworthy features of the ROV-operated subsea CRT include:
Coating thickness:
50-100mm
Stroke:
up to 1000mm
Water Depth:
up to 3000m
Pipe OD:
6" - 10" (interchangeable gripping pads)

This state-of-the-art tool not only provides an effective solution for targeted coating and insulation removal but also demonstrates IK Norway’s commitment to advancing subsea technologies in challenging underwater environments.

Client:
Trident Energy
Project Start/End Date:
06.2020 - 10.2020
Location of Project/ Region
Africa
Installation method:
ROV
Machining/Drilling/hot-tap
Size of hole drilled/section of coating removed:
Multilayer PU insulation and FBE coatings on 6”, 8” and 10” pipe spools.
Material drilled/removed:
The coating removal tool includes both milling heads and wire brushes for the coating removal and surface preparation.

Learn more

Case study